Model kit product teams
For teams planning commercially manufactured, injection-molded kits and coordinating product, engineering, sourcing and launch requirements.
Plastic model kit OEM manufacturing
ITTAK supports hobby, IP and toy brands with in-house tooling and production of HIPS, ABS and PVC components—from engineering and molding to finishing, assembly and packaging.

Built for branded projects
ITTAK focuses the first conversation on product fit, available inputs, manufacturing scope and the questions that need engineering review.
For teams planning commercially manufactured, injection-molded kits and coordinating product, engineering, sourcing and launch requirements.
For IP, anime, game and character brands evaluating how a product concept can move into an agreed manufacturing program.
For toy and collectible businesses that need a clearly scoped partner across tooling, molding and downstream production.
Manufacturing scope
Services are combined around the actual project—not sold as a generic one-size-fits-all package.

01 / PROCESS
Review available product data, assembly intent and manufacturing questions before tooling decisions are made.

02 / PROCESS
Connect part design to mold construction and define how trial feedback and revisions will be handled.

03 / PROCESS
Produce HIPS, ABS and PVC components in-house, with material and appearance requirements confirmed for each project.
Spray painting
Tampo Print04 / PROCESS
Coordinate spray painting, Tampo Print and appearance controls where the product specification requires them.
Assembly line05 / PROCESS
Coordinate component assembly and define the packaging requirements included in the reviewed project scope.
How projects move forward
A clear review path connects the available product information with engineering decisions, customer approvals and the final production scope.
Share the product concept, target market, expected quantity range, schedule and available files.
Clarify parts, materials, assembly, appearance, packaging and the manufacturing scope ITTAK should support.
Define the tooling approach and how trial output, feedback, revisions and approvals will be handled.
Confirm the molding, finishing, assembly and packaging activities included in the production scope.
Project galleries
Explore finished models together with available runner, component and tooling views, then discuss the manufacturing questions relevant to your project.

KAIYODO / ARTPLA
Finished model, molded parts and tooling highlights
View project gallery
KAIYODO / ARTPLA
Finished model, runners, tooling and molded-detail highlights
View project gallery

Factory & quality planning
Fit, visible surfaces, gate and runner implications, shrinkage and warpage risk, color, finish, assembly and packaging criteria differ by product.
Planning resources
Practical content built around decisions buyers need to make before tooling and production.
Materials guide
A practical buyer overview of how part function, rigidity, finish and process requirements influence material selection.
Read guideManufacturing guide
Follow the project from manufacturing review and engineering through tooling, molding, finishing and packaging.
Read guideSupplier guide
Questions brand, engineering and sourcing teams can use to review capability, tooling, quality and IP controls.
Read guideBuyer FAQ
Start with the product type, development stage, intended size and assembly approach, material preference if known, expected quantity range, target timing, sales markets and the services you need.
A project can be reviewed at different development stages. The level of detail available will determine which questions can be answered and what engineering input is needed before tooling or production can be scoped.
ITTAK produces components using HIPS, ABS and PVC. The appropriate choice depends on part function, structure, appearance, finishing and other project requirements, so material selection is confirmed during review.
These are project-specific. Design maturity, part and tool complexity, material, finishing, assembly, packaging, quantity plan and approval cycles all influence the manufacturing plan.
Begin with a non-confidential overview. If an NDA is required, indicate that before sending unreleased designs or other sensitive project files and wait for ITTAK to confirm the next step.
Start with a manufacturing review
Tell us what you are developing, what information is available, the expected quantity range, target timing and manufacturing support you need. ITTAK will review the fit and clarify the next steps.